Sector F-14 in Islamabad is moving forward with visible ground preparation. Heavy equipment is leveling land and cutting alignments, while workers mark out the road network that will link its pockets.
Main Roads Taking Shape
Two wide arterial roads form the backbone of Sector F-14’s connectivity:
- West Markaz Road: A 120-foot central artery for commercial and residential movement.
- Dilzak Road: Also 120 feet wide, it meets West Markaz Road at a central junction and links major parts of the sector.
Crews have carved out wide earth beds for both routes, preparing the ground for future paving and utilities.
Sub-Sector Work Under Way
- F-14/3: Next to West Markaz Road, with preliminary street cutting, emerging alignments, and terrain grading.
- F-14/4: A focus for ground clearance and earthmoving.
- F-14/1 and F-14/2: Adjoining zones completing the planned grid alongside F-14/3 and F-14/4.
What the Ground Shows Today
Machinery is cutting high spots and filling low areas to level streets and plots. The 120-foot roadbeds of West Markaz Road and Dilzak Road are clearly visible, showing steady progress toward connecting Sector F-14’s pockets.
کیا آپ رئیل اسٹیٹ مارکیٹ کے تازہ ترین رجحانات سے باخبر رہنا چاہتے ہیں؟
محفوظ اور منافع بخش سرمایہ کاری کے فیصلوں کے لیے ہمارا آفیشل واٹس ایپ چینل آج ہی فالو کریں! ہم آپ تک پہنچاتے ہیں مارکیٹ کی درست ترین معلومات اور بروقت تجزیات۔ 📈✨
👇 ابھی ہمارے چینل کا حصہ بنیں:
https://whatsapp.com/channel/0029Va8D7O511ulLB3FgCK0u
Choudry Mujahid Yasin (CMY ) Owner of LahoreRealEstate.Com
https://wa.me/923224929992 Direct message to me now